IMG_0195_edited.jpg

STATIONS & FACILITIES

 

MAINTENANCE & UPGRADES

  • Corrosion Maintenance Program—Inspection, Evaluation and Repair

  • LACT Meter Upgrade and Installation

  • Production Separator Replacement

  • Safety Flow Diagrams and Safe Charts Based on API RP-14C

  • Vessel Design and Installation

  • Well Flowline Hook-Up

  • Compressor Removal (Heavy Lifts)

  • Compressor Installation, Upgrades and Maintenance

  • Process Systems Design, Permitting, Troubleshooting, Maintenance and Repairs

  • Design Piping per ASME B31.3 & API RP-14E

  • Relief Valve Sizing API RP-520 and API RP-521

  • Controls, Instrumentation, and Safety Systems

  • Process Design

  • Piping Repairs

 

OVER PRESSURE PROTECTION

  • Relief valve upgrades for compressors, pipelines, station piping, caverns, etc.

  • PSV and rupture disk design

  • Pressure regulator design

  • Surge analysis and surge relief design for oil pipelines

COMPRESSION
EQUIPMENT

  • Install and remove compressors

  • Locate and manage refurbishment of used compressors

  • Size new and refurbished compressors

  • Manage compressor upgrades with updated compressor requirements

PROCESS SYSTEM UPGRADES

  • Size and design process equipment

  • Locate bottle necks and other issues in the process system

  • Develop remediation plans

  • Design, procure and install new process systems

 

(337) 896-1721

338 Thoroughbred Drive
Lafayette, LA 70507

©2020 by Chapman Consulting, Inc.