Our staff understands the difficulty of designing, procuring, and integrating equipment. We have the knowledge and experience to help with your new and upgrade projects.
-
MAJOR PIPELINE CONSTRUCTIONPipeline Re-Routes Pig Trap Modifications and Upgrades Pipeline Installation In-Place Abandonments and Reverse Lay Removal Pipeline Interconnects Geo-Science Studies to Define Permit Scope and Minimize Removal Obligations Pipeline Modifications and Tie-Ins Installation & Repairs per ASME B31.4/B31.8 and PHMSA Facilitate and Certify Hydrotesting Riser Repair, Replacement, and Bend Upgrades Hot Taps
-
COMPLEX PIPING MODIFICATIONSPipeline Design, Permitting and Installation (B31.4, B31.8, CFR 49 192 & 195) Station Piping, Controls, Instrumentation, Pumps, Compressors, Meters, PSV’s, Measurement, Safety Systems, Vent / Flare, Drainage, Foundations, and Security Station Repairs, Excavations, Soil Loading, and Heavy Lifting Station and Pipeline Inspection / Surveys Pump Design Modification and Performance Testing Compressor Engineering and Turn Arounds Meter Installation and Modification Hydraulic Modeling and Analysis for Capacity Station Design and Modification
-
PIG TRAP INSTALLATION & MODIFICATIONSPig Launcher and Receiver Modifications and Replacements Temporary Launcher / Receivers Design in Large Diameter Applications Difficult Smart Pigs Piping Design and / or Trap Modification to Facilitate New ILI Technology
-
SMART PIGGING IN-LINE INSPECTIONSDevelop Maintenance Pigging Programs Project Feasibility Studies to Project Execution AFE Estimates ILI Data Validation, Evaluation and Assessment ILI Assessment Report Repair Recommendations Repair Execution Oversight Test Dig Verification Flushing, Pickling and Paraffin Plug Removal Maintenance Cleaning Programs
-
LEAK REPAIRSTest Digs Composite Wrap Repairs Spool Replacements Structural and Non-Structural Clamps Welded Sleeves Procedures and Engineering Design Welded Split Sleeve Repairs Crack Assessments
-
PIPELINE LOWERINGCoordinate and Evaluate Depth of Cover Surveys Geoscience and Depth of Cover Surveys Generate AFE Estimates Perform Calculations and Developed Work Procedures to Comply with API RP-1117 Provide On-Site Inspections Reroutes, Reburials, and Lowering per API RP-1117 Pipeline Collapse Pressure
-
PIPELINE REMOVALCoordinate Cleaning Procedures with Pipeline Companies Develop BSEE Flush and Pickle Procedures Plan and Coordinate Removal of Pipeline Risers and Subsea Tie-Ins Pipeline Removals (Reverse Pipe Lay) in Sand and Sediment Resource Areas (SSRA) Abandonment In-Place and Removal